INSTALLATION
Safety
INSTALLATION
6.
Safety
Only a qualified contractor should carry out installation, commis-
sioning, maintenance and repair of the appliance.
6.1
General safety instructions
We can only guarantee trouble-free function and operational reli-
ability if original spare parts intended for the appliance are used.
6.2
Instructions, standards and regulations
Note
Observe all applicable national and regional regulations
and instructions.
7.
Appliance description
7.1
Standard delivery
Delivered with the appliance: DHW sensor
7.2
Required accessories
Depending on the static pressure, safety assemblies and pressure
reducing valves are available. These type-tested safety assemblies
protect the appliance against unacceptable excess pressure.
7.3
Further accessories
Threaded immersion heaters are available as accessories.
If it is not possible to insert a rod anode from above, install a
segmented anode.
www.stiebel-eltron.com
8.
Preparations
8.1
Installation site
f Always install the appliance in a room free from the risk of
f
frost and near the draw-off point.
f Ensure the floor is level. Use the adjustable feet to compen-
f
sate for any unevenness in the floor.
f Ensure the floor has a sufficient load bearing capacity (see
f
chapter "Specification / Data table").
f Observe the room height and height when tilted (see chapter
f
"Specification / Data table").
Minimum clearances
The minimum side clearances can be swapped to left or right.
≥800
f Maintain the minimum clearances.
f
8.2
Transport
Material losses
!
We recommend removing the cylinder casing for trans-
portation to the installation location to prevent it from
becoming dirty or damaged.
For transportation, the appliance is secured to the pallet with
metal brackets.
f Remove the screws from the pallet.
f
f Turn the metal brackets to the inside of the adjustable feet
f
under the appliance.
≥300
SBB WP Trend |
15