Download Inhoudsopgave Inhoud Print deze pagina

Penetrations; Branch Piping Section - Mitsubishi Electric City Multi PUHY-P-YMF-B Installatiehandleiding

Inhoudsopgave

Advertenties

Beschikbare talen
  • NL

Beschikbare talen

Penetrations

Inner wall (concealed)
A B
Floor (fireproofing)
D
F
G
B
A Sleeve
B Heat insulating material
C Lagging
D Caulking material
E Band
F Waterproofing layer
G Sleeve with edge

Branch piping section

22
All manuals and user guides at all-guides.com
Outer wall
D
C
Roof pipe shaft
G
D
When filling a gap with mortar, cover the penetration part with steel plate
so that the insulation material will not be caved in. For this part, use
incombustible materials for both insulation and covering. (Vinyl covering
should not be used.)
Insulate the header using
the insulation
material attached to the
branch pipe kit
as shown in the figure.
A B
Penetrating portion on fire limit and boundary wall
I
B
H
F
H Lagging material
I Mortar or other incombustible caulking
J Incombustible heat insulation material
Outer wall (exposed)
E
B
I
J
A
1m
1m

Advertenties

Inhoudsopgave
loading

Inhoudsopgave