Cables
Disconnect the cable from the line. Also disconnect
opposite end to avoid errors due to leakage from other
equipment. Check each conductor to ground and/or
lead sheath by connecting one megohmmeter lead to
a ground and /or lead sheather and the other megohm-
meter lead to each of the conductors in turn. Check
insulation resistance between conductors by connecting
megohmmeter leads to conductors in pairs.
28
www.nieaf-smitt.com