Download Inhoudsopgave Inhoud Print deze pagina

Hach ORBISPHERE C1100 Basis Gebruikershandleiding pagina 6

Inhoudsopgave

Advertenties

The kit contains:
• four recharge cartridges with pre-mounted membrane and electrolyte. The type of membrane
mounted in the cartridge will be specific to the kit ordered
• anode cleaning tools
• a set of replacement O-rings
• a set of replacement Dacron
The black anode cleaning tool is used to clean the anode of any deposits or residue that may have
formed. It is doubled-ended so it can be used for two membrane replacement processes, each end
being used once.
®
The Dacron
mesh patches provide protection to the membrane.
Section 4 Installation
4.1 Sensor preparation
Your sensor has been thoroughly cleaned and tested at the factory before shipment. It has been
shipped with a cartridge containing a membrane and electrolyte pre-installed to protect the sensor
head. This cartridge must be removed and replaced with a new one prior to first use to make it fully
operational. The new cartridge is included in the sensor recharge kit. You will also need one of the
mesh patches included with the kit.
The following instructions detail the steps required to make the sensor operational. Should you have
any questions, your Hach Lange representative will be pleased to help.
Chemical exposure hazard. Obey laboratory safety procedures and wear all of the personal protective
equipment appropriate to the chemicals that are handled. Refer to the current safety data sheets
(MSDS/SDS) for safety protocols.
Note: It is advisable to perform this procedure with the plastic sensor base installed so as to avoid any damage to
the connection socket and also to provide a suitable stand for the sensor when required.
1.
1. Hold the main body of the sensor and unscrew the protection cap locking washer by turning
counter-clockwise. Remove it from the sensor and put to one side.
2. Pull/twist off the protection cap and put to one side. Remove the Dacron
cap and discard it.
3. Hold the sensor with the membrane facing down to avoid spilling any electrolyte, then carefully
unscrew the shipment cartridge. Drain the old electrolyte into a sink and flush away. Discard the
6 English
®
mesh patches
C A U T I O N
2.
4.
3.
®
mesh from inside the

Advertenties

Hoofdstukken

Inhoudsopgave
loading

Inhoudsopgave