Download Inhoudsopgave Inhoud Print deze pagina

Final Assembly - Vetus BOW7512D Gebruikershandleiding En Installatie-Instructies

Boegschroeven
Inhoudsopgave

Advertenties

5.3

Final assembly

• Grease the propeller shaft with 'outboard gear grease'*) and install
the propeller.
1
2
The propeller should run a minimum of 1.5 mm (
thrust tube wall, all round.
• Slide the flexible coupling onto the output spindle of the electric
motor as far as necessary to allow the end of the output spindle
(A) and the underside of the flange (B) to become aligned.
• Tighten the lock-screw (C).
• Grease the input shaft with an installation compound, like 'Mo-
lykote® G-n plus' .
• Grease the threads of the fastenings bolts with 'outboard gear
grease' *) and install the electric motor to the intermediate flange.
• For a first check, turn the propeller by hand, it should turn easily,
whilst being connected to the output spindle of the electric mo-
tor.
*) A suitable grease is VETUS 'Shipping Grease' , Art. code: VSG.
vetus® Operation manual and installation instructions bow thrusters BOW7512D and BOW7524D
Outboard Gear
Grease
3
1
/
") free of the
16
4
Outboard Gear
M8
12 - 15 Nm
(9 - 11 ft.lbf )
Molykote® G-n plus
ENGLISH
5
PH2
M5
2.5
3 Nm
Grease
6
21
020536.06

Advertenties

Inhoudsopgave
loading

Deze handleiding is ook geschikt voor:

Bow7524d

Inhoudsopgave