Download Inhoudsopgave Inhoud Print deze pagina

Commissioning And Functional Check - Kessel Ecolift Inbouw- En Bedieningshandleiding

Inhoudsopgave

Advertenties

5

Commissioning and functional check

For the initial startup, check whether the steps explained in the Assembly chapter have been carried out properly.
Functional test of pump and sensors
Press the "Flap" button at the control unit.
Check whether the wastewater flap closes. (Motor noise, lever switches automatically).
Let the connected water supplier run.
Check whether the pump starts up and pumps away the water that backs up on the house side.
Shut off the water supply pipes.
The system pumps away the residual water automatically
Check that the backwater flap opens again correctly. (Motor noise, lever switches automatically).
Installation and operating instructions
33 / 112

Advertenties

Inhoudsopgave
loading

Inhoudsopgave