INSTALLATION
Commissioning
6.4
Installation versions
6.4.1 Installing the immersion heater
The immersion heater is used for electric booster heating.
- With the SBP 200 | 400 the immersion heater can be mounted
on the r.h. or l.h. side.
- One or two immersion heaters can be mounted with the
SBP 700.
f Remove the cap from the connector.
f
f Undo the vent plug with an SW 32 socket spanner.
f
SBP E | SBP E cool
www.stiebel-eltron.com
SBP 700 E | SBP 700 E SOL
7.
Commissioning
7.1
Commissioning
Commissioning must only be carried out by a heating contractor.
f Fill and vent the appliance.
f
f Check the functions of the accessories in accordance with the
f
operating and installation instructions supplied with them.
f Check the function of the on-site safety valve.
f
7.2
Decommissioning
If the heating system is not in operation and the installation
location is not protected against frost, drain the appliance and
connected system. This is relevant where there is a risk of frost.
8.
Maintenance
No special maintenance is required for the appliance. A regular
visual check is sufficient.