EN
Function test
Switching on the device
Prerequisite
– The mains plug is plugged in.
– The device has been mounted and connected.
– The water supply at the ball valve has been
opened.
– The lateral design covers have been mounted.
– The lower design cover has been mounted.
– The spray shield has been mounted.
– The upper design cover has been mounted.
– If the interface module for flush actuation has
been installed as an option: All the plugs are
connected.
1
Lift up design cover.
38
2
Switch on device.
✓ Comfort model: The device initialises
after switching on. The status LED on the
lateral control panel flashes blue. After
approx. 2 minutes of warm-up time, the
storage water heater is ready for
operation.
✓ Classic model: The device initialises after
switching on.
162129588743651083 © 03-2022
970.058.00.0(01)