Inspection of the installation
Current regulations require the heating installation to be inspected before it is commissioned. The inspection must
be carried out by a suitably qualified person.
Description
✔
Hot water (page 23)
Shut off valves
Mixing valve
Cold water (page 23)
Shut off valves
Non-return valve
Safety valve
Electricity (page 24)
Connected supply
Sensors
Direct-current anode (only VPB
500, 750, 1000 E)
Temperature limiter
VPB 500, 750, 1000 | GB
Notes
Signature
Date
17