Download Inhoudsopgave Inhoud Print deze pagina
Inhoudsopgave

Advertenties

Beschikbare talen

Beschikbare talen

8. Installation/Setup

Assembly and installation of the device must be carried out by a specialist familiar with the hazards and the
relevant regulations. Maintenance, operation and commissioning of this device must only be carried out by
qualified persons.
When choosing a location for your device, make sure to avoid impact, vibration, dust, hot and cold tempera-
tures and dampness. Furthermore, no powerful transformers or motors must be used close to the device.
When setting up / installing the device, make sure that the power cord is not crushed and cannot be dam-
aged by any sharp edges.
Never operate the device on flammable surfaces or close to flammable objects. Always keep a distance of
at least 0.5 m from flammable objects.
Observe that the fog exit opening is not pointed at persons, animals or open flame. The escaping hot steam
may cause burns.
Ensure sufficient ventilation of the device, maintain the free zone around the device and never cover the
ventilation openings.
Never place the device on an unstable underground. Ensure that it does not fall down and cause injury.
The operating position of the device is horizontal so that the tank cannot spill when filling and in operation.
The device must be mounted or setup out of normal reach. If the device is suspended or operated in an
elevated location, make sure no one can enter the space beneath it (danger of slipping and injury due to
hot fog liquid and its residues).
During installation or service work, the area below the place of installation must be cordoned off.
The area or equipment of installation must be designed in such a way that it can support the tenfold rated
load for at least one hour without being deformed permanently.
It is also essential that the device is secured by means of a second safety restraint that is independent of
the actual mounting supports when installing it in an elevated position. No part of the installation must fall
down if the main suspension system fails.
All statutory regulations applicable in the respective country must be observed when installing the device.
Acceptance test (in case of industrial/public use):
Before first use and after any significant modifications, the installation (including the electrical connections)
must be inspected by an official expert.
A yearly inspection by an expert is required.
At least every 4 years, an acceptance test must be carried out by an expert.
• Set up the device under consideration of the above safety notes or install it with the mounting bracket (1) on a suit-
able surface or a suitable crossbeam system. The assembly must never swing freely.
• Secure the device with assembly fastenings that are compatible with the fastening surface and suitable for carrying
the weight of the device.
• Secure the installation or elevated set-up with a suitable safety restraint cable or safety net. The safety device must
be able to support the device in the event of a fault in the main support system.
• Align the device horizontally and tighten the bracket clamping screws (4).
21

Advertenties

Inhoudsopgave
loading

Gerelateerde Producten voor Renkforce FM01

Deze handleiding is ook geschikt voor:

1518603

Inhoudsopgave