Download Inhoudsopgave Inhoud Print deze pagina

Atag W G3X Maxus Gebruiksaanwijzing pagina 18

Inhoudsopgave

Advertenties

assembly
(continued)
Suspend the motor module on the threaded ends (1). Screw
the nuts on. M ake sure that the motor module is exactly level.
Drill holes (2 x ø 6 mm) and secure the motor module w ith the
1
fixing pins supplied (6 x 60) (2).
Fit the discharge duct.
Connect the motor module electrically.
2
fitting the hood
Fit the hood to the motor module.
First hook the rear of the hood into the motor module at the
bottom (1).
Then lift the front up (2) so that the tw o bolts supplied (M 5 x
12) can be screw ed in (3). Use these bolts to level the hood.
M ake the plug connections in the hood.
1
3
2
GB 12
assembly
(continued)
fitting the telescopic pipe
NB: During recirculation (W G8), the ventilation slits must not
be covered by the low er telescopic pipe.
Slide the flanged end of the upper telescopic pipe upw ards
betw een the fixing bracket and the w all, and slide the
telescopic pipe against the ceiling. The telescopic pipe locks
into position.
Hook the low er telescopic pipe onto the upper telescopic
pipe and allow it to drop.
Put the filters in place and test the extractor hood.
GB 13

Advertenties

Inhoudsopgave
loading

Deze handleiding is ook geschikt voor:

W g4x maxusW g8x maxusW eg3x maxusW eg4x maxusW eg8x maxus

Inhoudsopgave