Download Inhoudsopgave Inhoud Print deze pagina

Mitsubishi Electric PEA-RP200 GAQ Installatiehandleiding pagina 2

Inhoudsopgave

Advertenties

2
[Fig. 2.0.1]
1 Pipe cover (For field piping connection)
3
[Fig. 3.2.1]
* In case of PEA-200, 250
A
B
400
A
A
[Fig. 3.2.2]
* In case of PEA-200, 250
A
D
B
B
F
E
G
I
H
C
4
[Fig. 4.1.1]
A
B
A Ceiling board
B Edge beam
C Tie beam
D Square timber for hanging the air conditioner
E Pitch
2
B
C
200
1
2
3
Model
PEA-200
PEA-250
1 When connecting air inlet
2 When installing the suspension fixtures prior to installation of the
indoor unit without inlet duct
3 When hanging the indoor unit directly without inlet duct
A Service space
B Air inlet
C Air outlet
20
Model
D
PEA-200
PEA-250
D Suspension bolt pitch
E Top of the unit
F Suspension bolt holes
PEA-200, 250 : 4-ø12 holes
PEA-400, 500 : 4-ø15 holes
G Control box
H Drain pan
I Main body
E
E
C
D
3.2
A
B
C
D
1860
1260
900
400
2060
1460
A
B
C
1400
1300
634
1600
1500
4.1
[Fig. 4.1.2]
F Insert: 100 to 150 kg (1 piece) (field supply)
G Hanging bolt (field supply)
H Reinforcement
* In case of PEA-400, 500
A
1800
400
2400
A
* In case of PEA-400, 500
1947
D
1840
F
B
E
G
I
H
C
H
F
G
PEA-200, 250 : M10
PEA-400, 500 : M12
B
C
200
1
2
3
20
D

Advertenties

Inhoudsopgave
loading

Deze handleiding is ook geschikt voor:

Pea-rp250 gaqPea-rp400 gaqPea-rp500 gaq

Inhoudsopgave