Step 4 Set the System ON/OFF to ON state on the LCD screen.
Step 5 Switch on the AC breaker and wait for the inverter to power on.
If CT is connected, please perform the Meter/CT Check to check the correct
connection through the setting path: Menu > Setting > Advanced Setting >Meter/
CT settings > Meter/CT Check
If meter is connected, please set the connection of meter through the setting
path: Menu > Setting > Advanced Setting >Meter/CT settings
If Meter/CT is successfully connected , the power information of Meter/CT will
be displayed on the LCD screen. If the Meter/CT connection fails, the screen will
prompt "Meter Fault" or "Missed CT Fault".
3
Step 6 Switch the BAT switch to the "ON" position. Press and hold the BAT button for about
1 to 2 seconds, at the point, the status light flashes yellow light until finishing self test. Then
the status light flashes green light. After successful communication to the inverter, the
status light turns solid green light, and the SoC power indicators go solid green light.
4
Step 7 When the battery turns on, the inverter will restart automatically. The inverter will go
Waiting, Checking and Normal status in sequence.
160
Turn on AC breaker
Grid-LGrid-N
AC breaker
L
N
Main
breaker
2
1
Step 1. Switch the BAT
SWITCH to "ON".
Step 2. Press and hold
the BAT BUTTON for
at least 2 seconds. In
the meantime, the SOC
indicators will rapidly
flash yellow lights and
then turn to flash green
lights.
*Note: A system problem
may be encountered
while pressing the button
frequently. The user may
need to wait at least 10
seconds and then try
again.