Mechanical Installation
Mechanical Installation / Mechanische Installation / Installation mécanique /
Instalación mecánica / Instalação mecânica / Mechanische installatie / Installazione
meccanica / Instalacja mechaniczna / Mechanická instalace / Mekanisk installation
/Instalare mecanică / Механичен монтаж / Mekanisk installation / Μηχανική
εγκατάσταση / Mehaaniline paigaldus / Mekaaninen asennus / Mehanička ugradnja /
Mechanikai telepítés / Mechaninis montavimas / Mehāniskā uzstādīšana / Mechanická
inštalácia /Mehanska namestitev / Mekanik Kurulum / Instalação Mecânica /
التركيب الميكانيكي
There are two mechanical installation modes of X1-IES system, floor mounting and wall
mounting. The following is the two installation modes. Option C (with three battery
modules) is taken for an example.
*Note:
1. Please ensure that the bearing capacity of the ground and the wall, respectively,
that enable them to bear the loads of X1-IES system must be over 927 kg, which is
determined based on option C. If option D is chosen by the user, the bearing capacity
of the ground and the wall, respectively, must be over 1077 kg. (The maxium net weight
of an inverter (27kg) is taken as an example.)
2. The device must not be installed on the wood wall.
3. At least two persons are required to move the devices of X1-IES system.
4. Please reserve enough distance from the device to the ceiling (or the grounding) for
capacity expansion.