Download Inhoudsopgave Inhoud Print deze pagina

Installation; Mounting The Battery Charger - Dometic NDS POWER SERVICE PLUS25 Beknopte Handleiding

Inhoudsopgave

Advertenties

EN    
Fig. 
on page 3
2. Install the jumpers as required to set the charging
curve.
Jumper
Battery
configu-
type
ration
AGM
batteries
Gel bat-
teries
Flooded
and LiFe-
PO4 bat-
teries
Smart
alterna-
tor/Eu-
ro6 ve-
hicles
(LiFePo4
batteries)
NOTE If the charging curve for smart
alternators/Euro6 vehicles has been
selected, the battery charger is activated
aer a few seconds.
The charging curve is as follows:
AGM and gel batteries
Fig. 
on page 3
No. in
Charging phase
Fig.  and
quantity of
LED flashes
1
Reconditioning
2
Bulk
3
Absorption
4
Desulfation
5
Maintenance
12
Maxi-
Maxi-
mum
Float
mum
desul-
voltage
voltage
fation
(U
)
Maint
(U
)
voltage
Max
(U
Desulf
14.8 V
13.8 V
15.8 V
14.3 V
13.6 V
15.8 V
14.5 V
13.5 V
14.6 V
13.7 V
Flooded and LiFePo4 batteries
Fig. 
No. in
Fig.  and
quantity of
LED flashes
1
2
)
3
4

8 Installation

WARNING! Explosion hazard
Do not install the battery charger in the
vicinity of flooded batteries, as flooded
batteries produce flammable, corrosive and
explosive gases.
NOTICE! Damage hazard
Ensure that the mounting surface is capable
of supporting the weight of the battery
charger.
NOTE Install the battery charger as close to
the house battery as possible.

Mounting the battery charger

NOTE The battery charger can be installed
in any position. If the battery charger is
mounted on a vertical surface, the short side
should be installed in parallel to the floor. The
connections should point downwards.
1. Mount the battery charger with 4 flange screws.
Fig. 
on page 4
Charging phase
Reconditioning
Bulk
Absorption
Maintenance
NOTE When an LED has indicated the
charging phase by flashing, a 2 s pause
follows. Aer the pause, the current
charging phase is indicated again. This
process is repeated until the house
battery is fully charged.
on page 4

Advertenties

Inhoudsopgave
loading

Inhoudsopgave