Download Inhoudsopgave Inhoud Print deze pagina

Installing The Protective Casing - LEGRAND Ecotap Duo Handboek

Inhoudsopgave

Advertenties

Beschikbare talen

Beschikbare talen

Diagram 1.0

19.2 Installing the protective casing

The protective casing pipe (80cm) is supplied along with the foundation.
Once the casing has been mounted on the foundation, the clear plastic protective lid on the
bottom of the charging station can be removed.
Install the casing bottom side-down and fix it in place using the support clamp. (diagram 1.1)
23. www.ecotap.nl
01-05-23

Advertenties

Inhoudsopgave
loading

Inhoudsopgave