Download Print deze pagina

Hach CL17sc Gebruikershandleiding pagina 23

Advertenties

Beschikbare talen
  • NL

Beschikbare talen

  • DUTCH, pagina 179
Figure 6 Remove the pump clamp
7.6 Prepare for shipping
Chemical exposure hazard. Obey laboratory safety procedures and wear all of the personal
protective equipment appropriate to the chemicals that are handled. Refer to the current safety data
sheets (MSDS/SDS) for safety protocols.
To prepare the analyzer for shipping, do the steps that follow.
Items to collect:
Beaker with deionized water (2x)
1. Remove the reagents from the reagent lines as follows:
a. Remove the indicator bottle and buffer bottle from the analyzer.
b. Put two beakers (or containers) that contain deionized water in the analyzer.
c. Put the indicator bottle tubing and the buffer bottle tubing in the beakers.
d. Push menu, then select SENSOR SETUP > [select analyzer] > PRIME.
The analyzer removes the reagents from the reagent lines.
2. Remove the deionized water from the reagent lines as follows:
a. Remove the indicator bottle tubing and the buffer bottle tubing from the beakers.
b. Remove the two beakers from the analyzer.
c. Push menu, then select SENSOR SETUP > [select analyzer] > PRIME.
The analyzer removes all of the liquid from the reagent lines.
3. Disconnect the analyzer cable from the controller.
4. Turn the shut-off valve to the closed position to stop sample flow to the Y-strainer.
5. Disconnect the sample inlet (black) tubing and drain (clear) tubing from the analyzer.
6. Remove the pump clamp. Refer to
7. Remove the tubing harness and stir bar from the analyzer. Keep the tubing harness for shipment
with the analyzer. Refer to
8. Install the pump clamp without the tubing harness. Put tape on the tubing clamp to hold the tubing
clamp tightly.
9. Remove the water from the cell with a disposable dropper or a no-lint cloth.
C A U T I O N
Figure 6
on page 23.
Step 3: Install the stir bar and tubing harness
Original packaging
on page 13.
English 23

Advertenties

loading