ENGLISH
The appliance is supplied with a connection
cable. This has to be provided with a prop-
er plug, able to support the load marked on
the identification plate (refer to the Techni-
cal data chapter).
The plug has to be fitted in a proper socket.
If connecting the appliance directly to the
electric system, it is necessary that you in-
stall a double pole switch between the ap-
pliance and the electricity supply, with a
minimum gap of 3 mm between the switch
contacts. The double pole has to be of a
type suitable for the required load in com-
pliance with the current rules.
The connection cable has to be placed in
order that, in each part, it cannot reach a
90 °C temperature. The blue neutral cable
must be connected to the terminal block
marked with "N". The brown (or black)
phase cable (fitted in the terminal block
contact marked with "L") must always be
connected to the live phase.
Replacement of the connection cable.
Warning! The replacement of electric
cable must be carried out exclusively
by the After Sales Service or by personnel
with similar competencies, in accordance
with the current regulations.
If the connection cable must be replaced,
only a type H05V2V2-F T90 cable must be
used. The cable section must be suitable to
the voltage and the working temperature.
The yellow/green earth wire must be ap-
proximately 2 cm longer than the brown (or
black) phase wire.
To open the terminal block and reach the
terminals, proceed as follows:
1. insert the point of a screwdriver into
one of the two visible protruding part of
the terminal block
2. exert a light pressure and lift
Gas setting conversion
This model is designed for use with
natural gas but can be converted for
use with butane or propane gas providing
the correct injectors. The injectors not sup-
plied with the appliance have to be or-
dered from After Sales Service (refer to the
Service chapter).
For data concerning injector replacement,
see chapter "Technical data"
Warning! Conversion or replacement
can only be performed by a registered
installer.
To replace injectors:
1. Remove pan support.
2. Remove burner cap and crown.
3. With a socket spanner 7 unscrew and
remove the injectors, replace them with
the ones required for the type of gas in
use.
4. Reassemble the parts, following the
same procedure backwards.
Important! Replace the rating label (placed
near gas supply pipe) with relevant one for
the new type of gas supply before sealing
the appliance. If the appliance is already
sealed please stick it directly on the user
manual booklet after Technical data
chapter close to the rating plate drawing.
12