Download Inhoudsopgave Inhoud Print deze pagina
Inhoudsopgave

Advertenties

Beschikbare talen

Beschikbare talen

Chapter 3

3.1 Installation

The electrical, ventilation and execution
technical installation has to be executed
by a certified fitter in accordance with the
current national and local regulations. For
custom made versions of the extractor,
please consult the enclosed installation
instructions.
We do not accept any responsibility if
the extractor is not installed, fitted and
used in accordance with the current
regulations and stated instructions.

3.2 Fitting

First determine the cut out in the ceiling in
view of the cooking hob; reinforce this cut
out with a recessed beam frame. The
beam itself should be at least 36mm thick.
If fitted with a top connection it is
preferred to have the beams parallel with
the short sides because of the protection
cap of the position indicator.
If combined with the optional flat duct
system, the beams have to be parallel
with the duct direction. If the beams are
parallel with the long side, an extra cut out
has to be made in the front beam
approximately next to the position
indicator.
EN 6 Installation
All manuals and user guides at all-guides.com
dimension
800x500
1200x500
1200x700
1500x500
1500x700
1500x700* 542-315-542
1800x700* 693-315-693
* double panels
X
Y
[mm]
750
430
950
430
950
500
1250
430
1250
500
600
600
X
Cut out measure around +5mm
of underbox excl. flange
above termination
Z
>36
>36
>36
>36
>36
>36
>36
Y
Z

Advertenties

Hoofdstukken

Inhoudsopgave
loading

Gerelateerde Producten voor ABK NEERIM

Inhoudsopgave