Download Inhoudsopgave Inhoud Print deze pagina

Electrical Connection; Initial Start-Up; Handover; Specification - Stiebel Eltron MHJ E Handleiding Voor Bediening En Installatie

Inhoudsopgave

Advertenties

Beschikbare talen

Beschikbare talen

INSTALLATION

Initial start-up

10.2 Electrical connection

Material losses
!
- Trim the power cable so it leads directly to the appli-
ance connection socket.
- When trimming the power cable, ensure that the
natural stone heater can still be easily removed from
the wall.
f Connect the power cable to a suitable socket.
L
N
PE
11. Initial start-up
Material losses
!
When heating up the natural stone heater for the first
time, observe a maximum heat-up time of 20 minutes.
Then let the panel cool down for at least 60 minutes.
f Perform this process one more time.
Note
f In the first two days of use, heat up the natural stone
heater step-by-step to the required room tempera-
ture.
This way, you avoid hairline cracks. If hairline cracks do
develop, these are harmless and do not impair the func-
tion or the safety of the natural stone heater.

12. Handover

f Explain the functions of the appliance to the user. Draw spe-
cial attention to the safety instructions.
f Hand over the operating and installation instructions to the
user.
www.stiebel-eltron.com

13. Specification

13.1 Dimensions and connections

MHJ E
MHS E
MHP E
MHG E
a10 Height
a20 Width
b01 Cable entry
i13

13.2 Minimum clearances

a20
Wall mounting brackets
≥100
MHJ E | MHS E | MHP E | MHG E |
70
≥100
17

Advertenties

Inhoudsopgave
loading

Deze handleiding is ook geschikt voor:

Mhs eMhp eMhg e

Inhoudsopgave