INSTALLATION
Specification
10.7 Checking the earth conductor in accordance
with BGV A3
f Isolate the appliance from the power supply by means of
f
the fuse/MCB in your fuse box or by pulling the plug of the
power cable.
f Pull off the temperature selector.
f
f Carry out the tests at the mounting screw of the temperature
f
controller underneath the temperature selector and at the
earth conductor contact of the power cable.
11. Specification
11.1 Dimensions and connections
SNU HOT
263
140
c08
c01
100
c01
Cold water inlet
c08
Hot water outlet
20
| SNU HOT | HOT 3in1
230
70
SNU HOT
Male thread
G 3/8 A
Male thread
G 3/8 A
HOT 3in1
210
65
75
11.2 Wiring diagram
1/N/PE ~ 200-240 V
5
4
3
L N
1 Temperature limiter (safety fuses)
2 Temperature sensor
3 PCB
4 ON indicator (LED)
5 Electric heating
11.3 Heat-up time
During the initial commissioning and when drawing off the entire
hot water content, heat-up takes approx. 15 minutes.
ø 33
1
2
www.stiebel-eltron.com