Fork spanner
Surface mount
Chemical anchor (4000N) e.g. Hilti HIT 170 with 8.8
anchor M10 (in combination with C20/C25 concrete)
Concrete cutter
Conduit (cable protection tube)
A. PREPARATION
A.1 Transportation advice
WARNING Not taking the right precautions
could result in accidents and/or damage.
WARNING When using heavy equipment
follow the safety instructions provided by the
manufacturer.
CAUTION The person(s) transporting the product
should wear the required protection and clothing.
• Before transporting check the box and pallet
for any damage or loose parts
• When using (heavy) equipment make sure the
person is certified when required to use the
equipment
• Always transport the product upright
• Always use the supplied pallet and transport
materials
• Extra equipment may be necessary to safely
transport the product
• Make sure the used equipment can handle the
weight and size of transporting the product
• Transport the product as close as possible
to the eventual place of installation before
unpacking the product
A.2 Dimensions of the installed Memo
A.3 Overview of products
CAUTION The person unpacking the product
should wear the required protection and clothing.
CAUTION Do not unpack the product before
transporting it to the eventual place of installation
to prevent damages.
• Use a forklift to load and unload the pallets
• Use a cross slot screwdriver (not included) to
open the wooden crate
• Unpack the product in a dry environment
13mm
24x
-
20 m / Ø32mm
• While unpacking the product check the product
for any damages or missing parts
• Check cables for any damages
• Please recycle and discard the packaging
material correctly
A.4 Make sure there is at least 1,5 meters (5ft)
distance between the Memo posts and surrounding
objects.
A.5 Make sure the power cable is located in the
centre of the Memo and has an overlength of 1,5
meters (5ft). *Use local standards to determine
how deep electrical wires need to be buried.
WARNING The main power cable should be
connected to a separate group in the fuse box with
a 30 mA RCD with a 10A or 16A fuse.
A.6 If needed, prepare the ground:
• Make sure the surface is level in all directions
• Determine ground level (0 level), which is the
reference point for all other dimensions
• Make sure that the Memo will be placed
perpendicular to and directly on the prepared
surface
A.7 Choose the installation type suitable for the
surface on which the Memo will be installed.
WARNING A surface mount can only be done
when the existing surface is made of at least 15
cm [6"] solid concrete.
• Deep mount (in existing ground - anchors):
continue with part B
• Spider mount (in existing ground -
spiderframe): continue with part C
• Surface mount (on top of existing surface -
cable slots): continue with part D
59
1/2
24x
-
66ft / Ø 1.3"
YA3900-210727
EN
EN
NL
DE