STEP 7
A. Lay the Frame Pad (ref # 2) over the trampoline so that the springs and the steel frame are
covered. Please ensure that the Frame Pad covers all metal parts. Line up the elastic tie straps
as shown below in FIGURE 14 aligning alternate straps over leg socket.
LEG
SOCKET
B. Tie straps around leg socket as shown below in FIGURE 15.
LEG SOCKET
FRAME PAD (ref # 2)
(SKIRT IN LIFT-UP POSITION)
ELASTIC STRAP
ELASTIC STRAP
18