All wiring used to install Waves should
be made in accordance with national
regulations. Permanent connection to
the fixed wiring of the building should
be made in a suitable fuse box.
On the following pages, we'll explain
how Waves should be installed. We
strongly advise not to deviate from
the steps described below.
1. Turn front cover counter-
clockwise and remove
60
INSTALLING WAVES
• Do NOT switch on the power until installation is complete, that is until
the front cover of Waves has been placed back.
2. Unscrew and remove housing
cover
• Avoid blowing a fuse and protect yourself from getting hurt
by switching off the correct circuit breaker for the room
where you are installing Waves, or remove the fuse from the
fuse box.
Pull the power cable through the opening in the
housing and make sure the cable is long enough.
Don't remove ring for Ø 125 version.
3. Mount Waves in the wall
opening
CABLE