INSTALLATION
H
Fig.15
- Connect the flexible pipe H (not provided) to
the air evacuation hole A (Fig.15).
F
F
Fig.17
- Connect the top chimney B to the structure
using the two screws F (Fig.17).
GB 26
A
2
B
1
Fig.16
- Connect to the electrical mains (Fig.16).