Download Inhoudsopgave Inhoud Print deze pagina

Components And Installation; Electrolysis Cell Connection; Installation Diagram - Astralpool Clear Connect Snelstartgids

Inhoudsopgave

Advertenties

Components and installation

Device
(7 g / 12 g / 21 g) (30 g / 40 g)
pH KIT (optional)
pH KIT and ORP KIT only available for the scalable models.

Electrolysis cell connection

mod. 7 g/h - 12 g/h
mod. 21 g/h

Installation diagram

Filter
Note: This schematic represents an installation of a scalable model with all options installed. This schematic may vary depending on the model purchased.
Flow Switch KIT
Cell
(optional)
ORP KIT (optional)
4
X2
4
X2
Device
Electrical panel
Flow switch
other
equipment
Anchor: 8x50mm
Screw: 5x50mm
ATTENTION: Always install vertically on a rigid surface and in a
dry and ventilated place. It is recommended that the equipment be
installed in locations that are not exposed to the elements. Avoid the
formation of corrosive atmospheres.
Refer to the full manual for more
information on installation and wiring.
mod. 30 g/h - 40 g/h
1
4
RED CABLE
RED CABLE
YELLOW CABLE (AUX)
ORANGE CABLE (TEMP)
ORANGE CABLE (TEMP)
Cell
Injector
ORP
pH
Outlet
Inlet
Device installation on a wall
3
AUX
2
A A U U X X
Pump
pH
ORP sensor
pH sensor
230V
Cell
pH Pump
Injector
pH-minus
EN
X X 2 2

Advertenties

Inhoudsopgave
loading

Inhoudsopgave