The pipes must be screwed firm-
ly to their attachment points.
Conduct a test to ensure that there
are no gas leaks once the network
gate valve is open (Fig. 4).
Do not connect the appliances
to networks containing gas
with carbon monoxide or other
toxic components
Upon completion of the operations de-
scribe, close the network gate valve
(Fig. 3).
If it is necessary to replace the
nozzle to conform to another
type of gas supply, see the pro-
cedure described in the Operations for
commissioning (see chapter 5).
GAS TYPE CHANGE - see SECT.
IMAGES - REF. g)
The appliance comes from the
factory with setting to the type
of power indicated on the pla-
te. Any other configuration that chan-
ges the parameters set must be au-
THE PRESENT MANUAL IS PROPERTY OF THE MANUFACTURER. ANY REPRODUCTION, EVEN PARTIAL, IS PROHIBITED.
POWER SUPPLY CONNECTIONS
thorized by the manufacturer or by
its representative.
sonnel authorized to perform the ope-
ration in question. The correct procedu-
re to be implemented for the transfor-
mation is described in the relevant
manual.
must be requested directly from the
manufacturer.
with new the parameters reported on
the adhesive document provided.
attachment and one inside (see image
reference g).
- 12 -
The transformation from one type
of power to another must be per-
formed by qualified technical per-
Injectors - By Pass - Pilot injectors
- Apertures - and anything neces-
sary for any gas transformation
At the end of the transformation
from one type of power to another,
change the label on the appliance
Two plates may need to be repla-
ced in certain cases (oven equip-
ment), one outside near the gas