operating manual TQ robot control cabinet
Installation location
Packaging
Positioning
Installation
Electrical installation
© V 1.0 | 07/2022 | ENG
BA_REV.0300
The control cabinet must be installed in a roofed, weatherproof, clean
and dry environment.
•
The installation location (wall mounting) must have sufficient
lighting and sufficient air circulation.
•
The installation location and workstation have to meet all legal
provisions.
•
At the installation site, ensure sufficient space for
–
tasks involving operation, inspection and maintenance.
•
If required, insulate the installation site from vibrations.
Vibrations and shocks to which the control cabinet is exposed,
must not compromise the control cabinet function.
The packaging of the control cabinet components must be recycled
or disposed of according to legal provisions.
Refer to the packaging description.
chapter 4, Transportation
DANGER – Live components, tasks
There is a risk of electrocution when realising tasks at live
components.
•
Only electro-technical specialist personnel are
permitted to perform tasks on electrical or electronic
components while complying with the currently
applicable electro-technical guidelines.
•
Never use a defective or damaged mains cable for
control cabinet operation
DANGER – control cabinet, Electrical installation
Danger from incorrect electrical installation (distribution boxes,
etc.)
•
Testing as per DGUV Rule 3
The customer's employees are tasked with unloading and positioning
the components at the place of installation.
The control cabinet is designed for wall mounting.
•
Fasten the control cabinet to the wall using the mounting plate
with welded ring nuts.
NOTE – control cabinet, Assembly/installation
Install horizontally
•
Use a spirit level
The device has its own 0.03A type A
residual current device.
Measures for effective protection from electric shock on the mains
side must be checked and implemented accordingly by the switching
system engineer or operating company.
NOTE – Electrical installation
Copyright © TQ-Systems GmbH
40
Installation