Download Inhoudsopgave Inhoud Print deze pagina

Commissioning - Kessel Aqualift S 100 Mono Inbouw- En Bedieningshandleiding

Inhoudsopgave

Advertenties

Beschikbare talen
  • NL

Beschikbare talen

  • DUTCH, pagina 75
5

Commissioning

Check whether the steps explained in the chapter on assembly have been carried out correctly.
Clear any building waste from the tank if necessary.
Connect to the mains connection.
Connect the system to the power supply. If applicable, lift the float switch to check whether the submersible pump starts
up automatically.
With the connection of the connection cable(s) to the power supply, the system is ready for operation.
If installed, initialisation of the control unit starts automatically (separate instructions).
Installation and operating instructions
33 / 116

Advertenties

Inhoudsopgave
loading

Inhoudsopgave