INSTALLATION
COMMISSIONING
SW24
If necessary adjust the distance between the wall connector
»
and the tap body with water heaters of more than 30 l capacity.
1 Butterfl y valve
2 MEK tap
3 MED tap
4 MEB tap
10
|MEK | MED | MEB
Affi x the water inlet pipes to connect the water heater and the
»
tap body.
Fit the following onto the tap bodies:
»
— MEK: the spout
— MED: the shower hose with the hand shower fork
— MEB: the pivoting arm with the shower hose and the hand
shower fork
11. Commissioning
11.1 Filling the water heater
Pull the lever forward and pivot it to the left.
»
Wait until the water is coming out of the outlet without bubbles.
»
11.2 Checking the maximum fl ow rate
With non-pressurised water heater the following
!
fl ow rates must not be exceeded when the mixer tap
is fully open:
5 l/min with
10 l/min with
12 l/min with
18 l/min with ≥ 30 l water heater
Reduce the fl ow rate if it exceeds the stated limit. This can be
done with the butterfl y valve in the wall connector (see diagram):
1
Remove the cap.
»
Turn the adjusting screw to the right with a screwdriver.
»
11.3 Switching on the water heater
Only turn the water heater on once you have drawn bubble-free
water from the hot water tap.
2
3
4
5 l water heater
10 l water heater
15 l water heater
www.stiebel-eltron.com