If the device is not mounted directly on the floor, the space under
the device must be filled.
15
ONLY CLIMA CANAL H10
When the condensate drain pipes are being connected, the pipe
system must be sufficiently supported in order to prevent strain on
the condensate drain tray.
17
0-10 V
[B]
INPUT
GND
On the side of the hydraulic connection, you can find the terminal block for the electrical connection too.
[A] and [B] must be connected in the terminal block in the appliance.
44
14
Hydraulic connection : Overview of the coil connections .
The condensate drain system must be set up with an adequate
p-trap in order to prevent the infiltration of odours. Always install
a plug for cleaning in the lower part of the p-trap in order to allow
quick disassembly.Pour water into the condensate collection pan
and check if the liquid is drained properly. Otherwise, check the
inclination and look for possible blockages.
24 V
[A]
POWER
GND
Hold the hydraulic connection during the installation !
16
ONLY CLIMA CANAL H10
3 cm/m