19.7 Fuses per connection value

Below you will find a table with an explanation of which fuses must be used per socket per
phase based on the network operator' s network connections used. With the right settings,
the right software selectivity per socket can be applied by means of the back office.
Net connection value
3x25 A
3x35 A
3x50 A
3x63 A
3x80 A

20. MAINTENANCE

27. www.ecotap.nl
Fuses to be placed per socket
20 A Gg fuses per socket per phase
25 A Gg fuses per socket per phase
32 A Gg fuses per socket per phase
32 A Gg fuses per socket per phase
32 A Gg fuses per socket per phase