Download Print deze pagina

Vitavia Cassandra 9900 Montage-Instructies pagina 7

Advertenties

The corner braces (2056) (4.10), the roof
braces (2057) (4.12) and the cross braces
(2033) (4.14) (4.15) (4.16) can now be con-
nected.
Adjust the greenhouse until it is completely
square and tighten all bolts.
Please do not over tighten. (max. 3Nm)
Press the end protectors (1017) and (1018)
onto the profile ends (4.13).
5R. and 5l. DooR
attention: Do not stand the assembled door
on the door gliders (1014) to avoid damaging
them."
Push the door gliders (1014) onto both ends of
door bar (1060) (5.1).
Assemble the door as shown in diagram 5.
Connect door rollers (1015) to the door bar
(1062) using bolt (1004), washer (1009) and
nut (1007) (5.4).
Bolt door bar (1062) to upper bar (1059) (5.3)
and slide the door seal (2021) into the outside
side bar (2058) (5.5). Slide bolts (1500) into
the bottom of the bolt channel holding brush
seals (2021) and fix it in place using nut (1515)
(5.6). Please ensure that for the inside side
bar, the part (2098) is used on the right in (5R)
and (2099) on the left in (5L). Connect the
door fixer (1111), (1112) and (1113) as shown.
Insert bolt (2001) where both parts (1047) join
as shown.
Loosen the door supports (2043).
Now slide the door rollers into the door runner
bar (1047) (5.7). Please ensure that the door
gliders are also running on the bottom track
(2070) (5.8).
Reconnect door supports (2043).
Adjust the door so that it moves freely.
6. Roof veNtS
Connect the side bars (1065) and the top bar
(1064) depending on the pane thickness.
Up to 4 mm, see (6.1). For 4 mm and over,
see (6.2).
Place the bolts to connect the bottom bar
(1066) in the prepared holes, and then slide
the glass into the tracks in side bars (1065)
(6.3).
Now connect bottom bar (1066), and ensure
that the window is totally square before tighte-
ning all bolts.
Position the window in the ridge bar from one
end (6.4) and (6.5) and slide it to the required
position (6.6).
063.01.1410
Connect the window sill (1063) with the extra
bolts in the roof bars (6.7).
Connect the window opener (1067) to the bot-
tom bar (1066) using screws (1006) (6.8).
Place the plastic cap (1019) over the end of
the window opener (6.6) and connect both
window fixers (2016) onto the window sill
(1063) using screws (1006) (6.8).
7. GlazING – cleaR GlaSS
Please note the already mentioned safety
precautions.
Press the glazing seals (1020) onto the alumi-
nium profiles (7.1) and cut to length.
Begin on the roof by positioning the glass in
place and fixing it by pushing the glazing list
into position at the side (7.1). Cut each list to
the length of the glass pane.
Continue to fix the glass panes into the sides
and doors cutting the glazing list to match the
glass pane.
fINIShING
If desired, it is possible to seal the greenhouse
at the edges using neutral silicone. Silicone is
not in cluded.
Place the warning label inside the house.
A full range of accessories is available to help
you make the most of this product. Please
contact your local stockist for details.
Safety NotIce
In the event of high winds, close all doors and
vents.
In the event of heavy snowfall, clear the roof
of the building or take suitable measures to
support the roof. Heat the building in winter.
commeNtS
For the complete protection of your new
greenhouse, we advise you to include it in
your house insurance. Please take note of
possible building rules relating to the position-
ing of greenhouses.
Please stick the greenhouse model label pro-
vided onto the door bar (1062) after success-
fully assembling this product. This information
is important in the event that replacement
parts are later required.
Please keep these Assembly Instructions in
a safe place, for future reference!
Our policy is one of continuous improvement
and we reserve the right to change the specifi-
cations without prior notice.
7

Advertenties

loading

Deze handleiding is ook geschikt voor:

Cassiopeia 9900Cassandra 11500Cassiopeia 11500