3. INSTALLATION OF THE ROBOT & AUTO STATION
AUTO STATION
1 Lay the dust collection charging pile on the at ground over 5cm
away from the wall, insert the power plug into the socket meeting the
requirements, and connect the power supply.
8
Place against the wall
2 Ensure that there are no obstacles whitin 1.2m in front of the auto station
and 0.5m on both sides.