1.5
Bath installation
Protect the bathtub properly during installation (eg carton, blanket, bubble foil, ...)
=
A metal support frame with 4 or more adjustable legs will be supplied with the bath. With the adjustable legs, ensure that
=
the bath is properly leveled and at the right height and do not forget to tighten the lock nuts afterwards. Check to ensure that
all the legs are resting properly on the floor.
A
If necessary, install the overflow-drain combination in the bath. Check whether all the components are properly mounted
=
according to the attached installation specifications of the manufacturer.
The bath may be fixed on the wall with a wooden lath (see Fig. 3 wall mounting) or using the clips provided (alternative)
=
that are fixed to the wall as shown on the next page. This mounting method is valid for installing the bath against tiles. It is
not advisable to have the tile edge on the bath as this could make access to installed mechanical and electrical
components difficult.
Level the bath properly.
=
Connect the bath to the drain pipeline.
=
IW00370.3
EN
F
ig. 2
Legs assembly
-4-
A
Fig. 3 Wall mounting