Installation and putting into operation of the UTN...EX Top
Mounted Level Indicator in explosion risk areas
Screw any loosely enclosed floats (7) onto the
guide
rod
Mounted Level Indicator on the tank to be monitored using
the mounting flange (5) provided. Use properly fitting
gaskets, bolts, washers and nuts for installation. Make sure
the gaskets used are corrosion-proof as required. Comply
with the limit values stipulated for the UTN...EX Top
Mounted Level Indicator for reasons of explosion protection
and within the framework of the intended use of the device
and the applicable laws and regulations (proof of inherent
safety). Compliance with any "Special Conditions" stipulated
in such laws or regulations is of particular importance.
Please comply with the maximum torque
ratings of the bolts / screws used when
tightening them down.
Use suitable gaskets. Make sure the gasket
material is resistant to the medium and its vapours as well
as to the expected temperature and pressure loads.
13 / 21
UTN...EX
(6). Mount
the
Top
Fig. 1
1
2
3
8
4
5
6
Eintauchtiefe
Depth of Immersion
Profondeur d´immersion
7
MBUTNEX.doc