Download Inhoudsopgave Inhoud Print deze pagina

Functional Control - TTM NoXygen C625 Installatie-, Bedienings- En Onderhoudsinstructies

Ontgasser
Inhoudsopgave

Advertenties

TTM NoXygen
EN
Installation, operating and maintenance instructions

Functional control

Preparation before function check - Test run settings
Before the function check, the pre-filters must be cleaned (see page 7) and the system pressure
needs to be at least 0.8 bar for the function check to be made.
to continuous operation by adjusting "Days left" to 1day
Set the TTM NoXygen
®
MOVEO
Progv 2.16
Days left:
0/30
MOVEO
Set the TTM NoXygen
®
to
continuous operation by
pressing
until "Days left"
appears on the display.
1. Cleaning prefilters
See page 7-8.
2. Expansion vessel control
Check that the expansion vessel is correctly adjusted with cor-
rect pre-pressure and that there is free expansion volume. The
TTM NoXygen
C625 requires at least 3 litres of free expansion
®
space. If it is suspected that the expansion space is too small,
install TTM Offset expansion vessel (art.no. 518853).
3. Pressure sensor control
Check that the "Pint" pressure on the TTM NoXygen
in idle mode is between minimum 0.8 bar and maximum 2.5
bar (the unit will not start if the pressure is below 0.8 bar, see
troubleshooting action 1.1). If the pressure on the display does
not match the system pressure, see troubleshooting action 7.
Also check that the "Pint" reaches at least -0.7 while the pump
is running. If not, see troubleshooting action 2.
4. Operating cycle time control
The time from pump start to pump start should not exceed the
recommendations in the table below. Long cycle times
indicate clogging of filters or flow restrictors.
See troubleshooting action 3.
Pressure
Time
1.0 bar
95 seconds
1.5 bar
90 seconds
2.0 bar
85 seconds
2.5 bar
80 seconds
TTM Energiprodukter AB
Slöjdaregatan 1 | 393 66 Kalmar | Sweden | Tel. + 46 480-41 77 40 | info@ttmenergi.se | www.ttmenergi.se
For latest updates visit www.ttmenergi.se.
C625
®
MOVEO
Settings
MOVEO
MOVEO
Then press simultaneously
+
to activate
"Settings".
display
®
Transparent
bottle
filled with
water
MOVEO
Settings
Days left:
0d
MOVEO
MOVEO
Then press simultaneously
+
to activate
editing mode.
5. Leakage control
Check that no fluid is leaking from the blue control hose, when
the "Pint" pressure is equal to the system pressure of the plant,
in case of leakage, contact TTM. Check that no system fluid
is leaking from any of the connections to the pump or vacuum
chamber.
6. Degassing capability control
When the TTM NoXygen
®
inlet and check that the "Pint" pressure reaches at least -0.7. If
not, see troubleshooting action 2. Allow the machine to stand
with the valves closed for at least 5 minutes and check that the
pressure does not change. If the pressure increases, there is a
leak, see troubleshooting action 5:3.
TTM MAG 54
Magnetite
separator
Blue
control hose
TTM NoXygen
®
Degasser
Settings
Days left:
MOVEO
Press
to set "Days left = 1d".
Confirm by saving the setting
with
.
starts, close the shut-off valve on the
Shut off valve
Shut off valve
2024-06
MOVEO
1d
MOVEO
9

Advertenties

Inhoudsopgave
loading

Gerelateerde Producten voor TTM NoXygen C625

Inhoudsopgave