Download Inhoudsopgave Inhoud Print deze pagina

Suspension Bolts; Marking Position Of The Suspension Bolts And Piping Connections - Hitachi CH-4.0NE Installatie- En Bedieningshandleiding

Inhoudsopgave

Advertenties

All manuals and user guides at all-guides.com
8
CH UNIT INSTALLATION

4.3. SUSPENSION BOLTS

- Select final location and installation direction of the indoor unit paying careful attention to the
space for the piping, wiring and maintenance.
- Mount suspension bolts, as shown below:
- For Concrete Slab:
- For Steel Beam:
- For Wooden Beam Suspension:
4.4. INSTALLATION

4.4.1. Marking Position of the Suspension Bolts and Piping Connections

- Mark position of the Suspension bolts, refrigerant piping connections and drain connection.
- See Installation dimensions in chapter 2.1.
No
Description
Steel
Insert (100 to 150kg)
Concrete
Anchor Bolt (W3/8 or M10)
No
Description
I Beam
Suspension Bolt
(W3/8 or M10)
No
Description
Wooden Bar
(60~90mm Square)
Wooden Beam
Square Washers
Nuts
Suspension Bolts
(W3/8 or M10)

Advertenties

Inhoudsopgave
loading

Deze handleiding is ook geschikt voor:

Ch-8.0neCh-12.0n

Inhoudsopgave