Download Inhoudsopgave Inhoud Print deze pagina

Before Operation; Continuous Drainage - eeese Carl 2506 Gebruikershandleiding

Inhoudsopgave

Advertenties

Beschikbare talen
  • NL

Beschikbare talen

  • DUTCH, pagina 124
UK
3.

Before operation

• Place the dehumidifier in an upright position on a stable, flat surface.
• Ensure the dehumidifier is at a safe distance at least 50 cm away from a wall or furni-
ture.
• Supply power should be in correspondence with the value on the nameplate, power
outlet needs to be grounded.
• Ensure the tank is correctly fitted, if the tank is full or not in place, the tank full light
comes on and the dehumidifier will stop working.
4.

Continuous Drainage

In general, water will be collected by tank, if you want continuous drainage, please do
steps as follows (refer to section 2 "Part List")
a. Insert the drainage pipe with 19mm inner diameter through the drainage outlet.
b. Put the water tank back in place.
Please always make sure the pipe is going downhill, and is not blocked or kinked.
88
MV-2506-09-2024 . eeese-aircare.com © All rights reserved by eeese air care ApS
≥20cm

Advertenties

Inhoudsopgave
loading

Deze handleiding is ook geschikt voor:

Carl2506

Inhoudsopgave