INSTALLATION
INSTALLATION
Dimensions SBP 700 E | SBP 700 E SOL
12 Thermal insulation
13 Heating flow
14 Heat pump flow
15 Thermal insulation sections
16 Flow, solar indirect coil (only SBP 700 E SOL)
17 Heating return
18 Heat pump return
19 Return, solar indirect coil (only SBP 700 E SOL)
5.3
Standard delivery
The standard delivery includes the following parts, packed in a
separate bag.
— Operating and installation instructions
— Detachable bezel for connecting lines
— Adjustable feet (only with SBP 200 E | SBP 400 E)
5.4
Special accessories
Description
BGC immersion heater
WPKI 5 compact installation
WPKI 6 compact installation
6.
Installation
6.1
Place of installation
»
Ensure the floor has a sufficient load bearing capacity (see
Specification table).
»
Check the height of the room (see Specification table).
www.stiebel-eltron.com
6.2
Transport
!
12
13
6.2.1 Removing the cylinder casing
14
Removing the cylinder casing
15
16
17
18
19
1
Lid
2
Cylinder casing
3
Plinth fascia
»
First remove the lid and then the plinth fascia.
6.2.2 SBP 700 E | SBP 700 E SOL
These appliances have side insulation sections that can be
removed. This will make transportation through narrow doors
and passageways easier.
»
Remove the retaining straps by opening the closures.
Part no.
When reattaching the retaining straps, ensure that the closures
075115
are near a joint between the casing parts.
220830
220831
6.3
Positioning
6.3.1 SBP 200 | SBP 400
»
Fit the adjustable feet provided, these are already fitted on SBP
E cool appliances.
»
Use the adjustable feet to compensate for any unevenness in
the floor.
6.3.2 SBP 700
?SP^P L[[WTLYNP^ OZ YZ_ SLaP LOU`^_LMWP QPP_ ?SP ZZ] X`^_
be level.
Risk of damage
We recommend removing the cylinder casing during
transportation to the installation location.
SBP E | SBP E SOL | SBP E cool |
1
2
3
13