Installation and Operation Manual
X-VA-MT3750C-eng
Part Number: 541B063AAG
October, 2017
2-9 Installation of Reed Switch Alarm
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
A. Install meter as described in Section 2-7
B. For Factory Mutual Approved installations and for CSA/NRTL/C
Certified installations, refer to Figures 2-4 and 2-5. On the system
printed circuit board is a three terminal block marked "Alarm Circuit".
The middle terminal is marked "Alarm In". This terminal is common for
both high alarm and low alarm applications. A circuit is completed by
connecting wires to "Alarm In" and to either "HI" for high flow alarm or
"LO" for low flow alarm. Wires used should be in the range from 12 to
20 AWG. Remove 0.3 inches of insulation before inserting the wire into
the terminal block and tightening the screw.
For electrical hook-up of units requiring intrinsically safe power connec-
tions, use Brooks optional power supply and relay connected as in
Figure 2-6 for the integral alarm.
Section 2 Installation
®
TM
Brooks
Ar-Mite
MT3750C
2-5