Download Inhoudsopgave Inhoud Print deze pagina

Gallagher MB150 Installatie-Instructie pagina 12

Inhoudsopgave

Advertenties

Beschikbare talen
  • NL

Beschikbare talen

  • DUTCH, pagina 17
3E4722 Gallagher MB150 MB300 Portable Energizer User Manual
Step 2. Connect Earth and Fence
Permanent Installa on
Connect the red and green energizer
terminals to the fence and earth stake
using lead-out cable. A ach lead-out
cable to the fence using a joint clamp.
(Figure 5)
Portable Installa on
Using the leadsets provided:
a) Connect energizer earth (green)
terminal to the earth stake
installed at least 3
the ground. (Figure 7)
b) Connect energizer fence (red)
terminal to the fence.
Step 3. Connect the Power
(This turns the energizer on.)
Ensure the fence is ready to operate.
Ba ery
a) Insert ba ery leadset into the
power socket of the energizer.
b) Connect red lead to the (+)
terminal of the ba ery,
c) Connect black lead to the (-) terminal of the ba ery.
Important: ONLY use a 12 V deep cycle lead acid rechargeable ba ery.
10
(1 m) into
Red
Red
Black
Green
Figure 7

Advertenties

Inhoudsopgave
loading

Deze handleiding is ook geschikt voor:

Mb300

Inhoudsopgave