Download Inhoudsopgave Inhoud Print deze pagina

Energizer Operating Description - Horizont hotshock A300 Bedieningshandleiding

Inhoudsopgave

Advertenties

Beschikbare talen
  • NL

Beschikbare talen

  • DUTCH, pagina 11

4. Energizer Operating Description

Rechargeable battery indicator:
The battery indicator ( LED 1) provides information about the battery voltage.
Press button:
Steady green light = Battery good
Flashing green light = Change battery
No green light = Battery depleted
The solar display lights up constantly in green when the solar panel charging voltage is greater than the voltage of the
battery.
5. Maintenance
Do note that temperature and measurement deviation may cause these figures to vary.
Caution!
When using a solar system
Only carry out a battery or rechargeable battery test at start of the day ( no solar power supplied - cover panel )
6. Disassembly, Dismantling, Storage and Transport
Disassembly, Dismantling
Before starting disassembly:
● Switch off energizer
● Disconnect entire energy supply from the energizer.
● Remove operating/auxiliary materials and any remaining working materials and dispose of in an environmentally-compati-
ble manner.
Then properly clean sub-assemblies and parts and disassemble them in taking account of the local industrial safety &
environmental protection provisions in force.
Storage, Transport
Ensure that the energizer is both stored and transported only when switched off.
NOTE!
Ensure that rechargeable batteries are stored in ventilated and dry rooms.
7. Faults and Repairs
WARNING!
Repairs may only be carried out by qualified persons.
Only the spare parts prescribed by the manufacturer may be used.
Subject to technical alterations!
4

Advertenties

Inhoudsopgave
loading

Deze handleiding is ook geschikt voor:

10613

Inhoudsopgave