Assembly:
Ensure that device is
disconnected during as-
sembly. Attach straight
tubes to bent sections
and screw in place with
4 screws.
Operation:
The device has 2 air speeds „O - 1 - 2" and can be swivelled by 90°.
Winter: Swivel the exhaust opening so that it is pointing at the ceiling and move the
switch to position „1". This will create circulation, and temperature differences in the
room will be balanced out.
Summer: Swivel the device to a horizontal or slightly angled position and move the
switch to position „2". Do not position the intake near an outside door - otherwise
cold air may be blown into the room.
Information requirements
Steba VT 2
Description
Maximum fan flow rate
Fan power input
Service value
Standby power consumption
Fan sound power level
Maximum air velocity
Measurement standard for service value
Contact details for obtaining more informa-
tion
8
Symbol
Value
F
11,3
P
55,8
SV
0,20
0,0
P
SB
L
66
WA
c
5,2
IEC 60879:1986(CORR.1992)
Steba Elektrogeräte GmbH & Co.KG
Pointstr. 2
96129 Strullendorf
Unit
m
/min
3
W
(m
/min)/W
3
W
dB(A)
meters/sec