Download Inhoudsopgave Inhoud Print deze pagina

Installing The Fronius String Control 100/12; Selecting Dowels And Screws; Installation Position; Selecting A Location - Fronius String Control 100/12 Gebruiksaanwijzing

Inhoudsopgave

Advertenties

Beschikbare talen

Beschikbare talen

Installing the Fronius String Control 100/12

Selecting dowels
Depending on the surface, different dowels and screws may be required for installing the
and screws
Fronius String Control 100/12. Therefore, these dowels and screws are not part of the
scope of supply for the Fronius String Control 100/12. The system installer is responsible
for selecting the proper dowels and screws.
Installation posi-
The Fronius String Control 100/12 must be installed vertically with the cable entries and
tion
exits facing downwards.
Selecting a Loca-
When selecting the location, please observe the following criteria:
tion
-
-
-
-
-
Installing the Fro-
IMPORTANT! The cover screws are under spring pre-load:
nius String Con-
-
trol 100/12
-
1
62
Install only on a solid and level surface; the housing must not warp when it is fastened
with the screws.
The ambient temperature may not fall below -25°C nor exceed +60°C.
The Fronius String Control 100/12 may be installed outside in sheltered areas. Avoid
direct contact with moisture.
Protect from direct sunlight and direct exposure to the elements.
Install under the solar modules where possible.
Press cover screws in with screwdriver first
Then screw in the cover screws
2
5
5
1
3
5
4
2
5
1
2
4
3

Advertenties

Inhoudsopgave
loading

Inhoudsopgave