Download Inhoudsopgave Inhoud Print deze pagina

Assembly; Checking The Items Supplied; Packaging; Tightening Torques For Screws Used - Actiforce Steelforce Pro SLS 90 Series Montagehandleiding

Inhoudsopgave

Advertenties

Beschikbare talen

Beschikbare talen

3 Assembly

Before attempting assembly, read the safety information in Section 2.

3.1 Checking the items supplied

 Carefully open the cardboard packaging.
 In doing so, do not use any long knife blades. They may damage the components inside.
 Check the parts supplied against the list in Section 1.6 Content box.
 Do not attempt to assemble the workstation frame if there is any damage or if there are any in-
correct components.

3.2 Packaging

 Remove the packaging. Treat as household waste/paper.
 Observe national legislation.

3.3 Tightening torques for screws used

 Assemble the workstation frame with the tools supplied only.

3.4 Assembly of the workstation

3.4.1 Recommended Top Sizes

Recommended Top Sizes
Frame set-up
110 cm
130 cm
150 cm
170 cm

3.4.2 Pre-assembly of the Crossbars

Assemble the following components:
1
Do not yet tighten the set screws on the crossbars!
Width / size table top
120 cm
140 cm
160 cm
180 cm
6
5
Depth / size table top
80 cm
80 cm
80 cm
80 cm
C
English
Table Top Thickness
2.5 cm
2.5 cm
2.5 cm
2.5 cm
6
9

Advertenties

Hoofdstukken

Inhoudsopgave
loading

Inhoudsopgave