ASSEMBLY
5
Hardware
Qty
G
Bolt (M12x60L)
2
H
Nut (M12)
4
I
Cap Nut (M12)
2
J
Cable (3.3 m)
1
K
Cable (10 m)
2
L
Handle Set
2
19 mm
4 mm
3 mm
1
Attach cable (J) in center of
weight stack.
2
Route cable (K) as shown.
3
Attach end of cable (K) as
shown. Pull cable through
upper/lower frame tubes using
provided guide wire.
4
Attach handle set (L) as shown.
5
Repeat steps 2–4 on other side.
NOTE: Allow cables to rotate freely
while being routed through the
pulleys, failure to do so could lead
to cable twisting.
20
mm
(¾")
J
I
K
H
G
L
ENGLISH
6
Hardware
Qty
M
Screw (Φ4x20L)
4
N
Decals
4
Snap plastic covers together, insert
screws, cover with provided decals.
7
Hardware
Qty
O
Screw (M6x20L)
8
4 mm
7
M
N
O