Download Inhoudsopgave Inhoud Print deze pagina

Screw Mounting; Mounting The Sensor - HomeMatic IP HmIP-ESI-IEC Installatie- En Bedieningshandleiding

Inhoudsopgave

Advertenties

Beschikbare talen
  • NL

Beschikbare talen

  • DUTCH, pagina 62
Start-up

6.2.2 Screw mounting

When selecting the installation
location, check for electrical wires
and power supply cables.
A round headed screw with a 3
mm diameter is to be used for
mounting.
To mount the HmIP-ESI using a screw,
proceed as follows:
• Draw a drill hole on the chosen
position using a pen.
• Screw the screw into the wall (use
a wall plug if necessary).
For wooden walls, you can pre-
drill the hole with a 1.5 mm drill to
make it easier to screw in the
screw.
The clearance between the bot-
tom of the screw head and the
mounting surface should be ap-
proximately 2 mm.
• Thread the screw channel (C) on
the rear side over the screw head.
Put the cover (B) onto the electronics
unit (D), ensuring that it latches fully
into place.

6.2.3 Mounting the sensor

To mount the sensor, proceed as fol-
lows:
• Place the reader head (G) in the
centre of the meter interface.
655133 kWh
The integrated magnet ensures it re-
mains in place. With standard-com-
pliant interfaces, the cable is routed
downwards.
• Finally, insert the sensor connector
(H) on the underside of the HmIP-
ESI into the connection point (E)
until it audibly clicks into place.
655133 kWh
19

Advertenties

Inhoudsopgave
loading

Inhoudsopgave