Download Inhoudsopgave Inhoud Print deze pagina

Set Up - Operating The Device - toparc KOOLWELD 1 Handleiding

Inhoudsopgave

Advertenties

Beschikbare talen
  • NL

Beschikbare talen

  • DUTCH, pagina 25
User manual

SET UP - OPERATING THE DEVICE

Only experienced personnel, authorised by the manufacturer, may set up and install the device. During setup, ensure that the power source is
disconnected from the mains power supply. Serial or parallel power source connections are not allowed.
DESCRIPTION
The KOOLWELD 1 cooling unit is designed to cool liquid TIG torches (L).
The cooling unit is controlled directly by the power source through the power cable (I-5).
Power source compatibility
This equipment is equipped with:
- a water level safeguard to prevent the water level from becoming too low for the unit, as well as the torch's water-cooling feature, to operate properly.
- a water flow safeguard to prevent clogs in the torch's water supply system and damage to the torch.
- a thermal safeguard to protect the torch against abnormal heating.
This equipment is automatically detected by the power source.
TITANIUM:
Select «System/Cooling unit» on the HMI:
- AUTO: activates when welding and deactivates the cooling unit 10 minutes after the welding is finished.
- ON: the cooling unit is permanently switched on.
- OFF: the cooling unit is switched off.
- PURGE
: a feature that is designed to purge the cooling unit or fill the water circuit; these safeguarding features are then deactivated.
TITAN:
In the menu «SEt UP» «Con FIG.»
- Co.U. On : the cooling unit is permanently switched on.
- Co.U. OFF : the cooling unit is switched off.
- Co.U. auto : activates when welding and deactivates the cooling unit 10 minutes after the welding is finished.
PRODUCT DESCRIPTION (II)
1.) Fill plug
2.) Coolant outlet (blue)
3.) Coolant inlet (red)
4.) Filling gauge
5.) Power cable
6.) Priming hose
PRIMING THE COOLING UNIT
When used for the first time or after emptying the tank completely, starting the pump may be difficult and may result in a lack of water flow. Use the
priming hose supplied with the product (II-6) and follow the instructions below to prime it correctly:
- Fill the coolant tank to its maximum level. The tank has a three-litre capacity.
- Connect the priming hose to the coolant outlet connector (II-2) and place the other end in an empty container (ideally a bottle).
- Turn on the power source.
TITANIUM:
On the HMI, select «System/Cooling Unit» and click on the icon
- Once the pump is running (with the container filling with coolant), stop the cooling unit by pressing one of the buttons on the HMI.
- Disconnect the ignition hose and refill the fluid in the cooling unit: the pump is now primed.
TITAN :
In the «SEt UP» «Con FIG.» menu, select «Co.U. On» to start the priming procedure.
- Once the pump is running (container filling with coolant), go to the «SEt UP» «Con FIG.» menu and select «Co.U. OFF
- Disconnect the ignition hose and refill the fluid in the cooling unit: the pump is now primed.
Translation of the original
instructions
KOOLWELD 1
TITANIUM 230 AC/DC FV
TITAN 231 DC FV
to start the priming procedure.
KOOLWELD 1
11

Advertenties

Inhoudsopgave
loading

Gerelateerde Producten voor toparc KOOLWELD 1

Inhoudsopgave