Download Inhoudsopgave Inhoud Print deze pagina

Charging The Rechargeable Battery; Assembly Of The Appliance; Connecting And Charging The Rechargeable Battery - SEVERIN 7144 Bedieningshandleiding

Inhoudsopgave

Advertenties

Beschikbare talen
  • NL

Beschikbare talen

  • DUTCH, pagina 33

Charging the rechargeable battery

Assembly of the appliance

3
Ch arging the rechargeable battery
illustrated Quick Start Guide
Installing the wall mount

Connecting and charging the rechargeable battery

Charging the rechargeable battery with wall mount
The rechargeable battery has to be charged using the wall mount before first use. It is best to charge
the rechargeable battery before each use, especially after the appliance has not been used for a
while. This increases the service life of the rechargeable battery and ensures the longest possible
cleaning cycles.
1. Make sure that the appliance is switched off (On/Off button in the "0" position).
2. Connect the mains adapter provided to an outlet.
3. Insert the appliance into the wall mount.
- The LED on the handle lights up red. The charging process starts.
- The LED goes out once the rechargeable battery is fully charged. The charging process takes
around 10 hours when the rechargeable battery is empty.
TIP: The appliance can remain in the charging station so that it is ready for use at all times.
For further information, see also illustrated Quick Start Guide.
Charging the rechargeable battery using a 12 V connection
The appliance can be charged using the 12 V connection (cigarette lighter) of a car.
1. Connect the small plug of the 12 V cable to the charging connection on the appliance.
2. Connect the large plug of the 12 V cable to 12 V connection in the vehicle. Switch on the vehicle
ignition as necessary.
- The LED on the handle lights up red. The charging process starts.
- The LED goes out once the rechargeable battery is fully charged.
18
1. Select a fitting location within drilling range of an outlet.
2. Hold the wall mount to the wall, aligned in a vertical po-
sition.
3. Mark the drilled holes with a pencil.
4. Drill the holes (approximately 6 mm Ø).
5. Insert the supplied dowels into the holes.
6. Fasten the wall mount using the screws supplied.

Advertenties

Inhoudsopgave
loading

Gerelateerde Producten voor SEVERIN 7144

Inhoudsopgave